- Waste management is an optional feature and is only available when Waste Management is enabled in game settings.
Background[]
Waste management includes the processes and actions required to manage waste from its inception to its final disposal. This includes the collection, transport, treatment and disposal of waste, together with monitoring and regulation of the waste management process and waste-related laws, technologies, economic mechanisms.
Waste can be solid, liquid, or gases and each type has different methods of disposal and management. Waste management deals with all types of waste, including industrial, biological, household, municipal, organic, biomedical, radioactive wastes. In some cases, waste can pose a threat to human health. Health issues are associated throughout the entire process of waste management. Health issues can also arise indirectly or directly. Directly, through the handling of solid waste, and indirectly through the consumption of water, soil and food. Waste is produced by human activity, for example, the extraction and processing of raw materials. Waste management is intended to reduce adverse effects of waste on human health, the environment, planetary resources and aesthetics.
The aim of waste management is to reduce the dangerous effects of such waste on the environment and human health. A big part of waste management deals with municipal solid waste, which is created by industrial, commercial, and household activity.
Gameplay[]
When the game setting Waste Management is enabled workers and many buildings create waste. This waste must be disposed or otherwise the republic will become polluted. To take care of waste the player has to provide vehicles and buildings to the republic. The player must collect the waste and make a decision on what to do with the waste; export via a Customs house and pay for the disposal or process it first and export it afterwards?
A way to dispose waste is to burn it or separate the waste. By separating waste the player is able to retrieve Plastic waste, Metal scrap and other resources from the waste for further processing or export. Resources from the separation process can be recycled to retrieve processed resources like Steel, Gravel, Plastic and others. If, in the end, there is still waste remaining, the player still can choose to burn it or export the remaining waste and pay for the disposal. For separation, recycling or burning of waste there are several buildings available, just as several waste storage buildings.
The waste itself is produced by workers living in residential houses or at places where the workers go to work. Waste is also produced by buildings like factories. All this waste has to be collected and processed and/or exported over the border. For transporting waste there are several road vehicles available like garbage and container trucks. These trucks pick up waste from buildings or from collection points near buildings and transport it for processing or export.
There are different kinds of waste, like Construction waste, Plastic waste, Metal scrap, Biological waste etc. Also, Mixed waste is available which, as the name implies, is a mix of different kinds of waste. Mixed waste can be processed to break it down into several other kinds of waste and later on recycled to get the processed resources out of it.
Demolition is also an additional option in the game's settings in combination with Waste Management. With demolition, the player has the option to mark a building for demolition and the demolition process starts. This process consists of tearing down the building by workers or blowing it up with Explosives. After demolition, garbage and container trucks handle the waste, leaving a clean spot for the player to put another building in.
General[]
The player has three options with Waste Management:
- Disabled
- Waste
- Waste + Demolition
When only Waste is selected the player needs to take care of the waste that is being produced in the republic by citizens and waste producing buildings like factories. Take care with the means of picking up the waste, process the waste in separation and or recycling plants. The player can ultimately choose to burn the remaining garbage or export it across the border.
There is another setting which contains the settings from Waste but with the addition of demolition. Demolition comes with a Demolition office from where the player can assign buildings to demolish. The demolition is a process where workers and road vehicles handle the demolishing of the building and Big container truck take care of the waste. The waste will be processed as the player configures the waste buildings to his needs.
Waste[]
Waste is being produced at places where workers live or work. Every building, where waste is produced, has default storage available, the Internal garbage container stand. When there are Trash containers in the neighborhood the waste is collected there and not in the waste producing building anymore. Garbage trucks will collect the waste from buildings and trash containers.
The waste collected from buildings and waste containers is a mix of different types of waste, named Mixed waste. The player can check the composition of the waste by hovering over the mixed waste icon or over a trash container icon and a small window appears with a description in percentages of how the waste is composed.
There are different types of waste
- Biological waste: When this waste is left in the storage it can turn into Fertilizer or it can be processed into fertilizer in a Composting plant. You can burn Biological waste but it won't generate much heat.
- Metal waste: Can be separated from waste and it becomes Metal scrap or Aluminum scrap after separation in Separation plants. Scrap can be stored in aggregate storage and it can't be burned.
- Construction waste: Is not burnable and can also be separated from waste and it turns into construction rubble. In a Gravel recycling plant the Construction waste is turned into Gravel and re-usable in Construction.
- Plastic waste: When separated from waste the Plastic waste can be transported to a Plastic recycling plant where new Plastic is created from the waste. Plastic waste can be burned, but has low heat value. When burning plastic waste it produces a higher amount of pollution, because it's a product based upon oil.
- Hazardous waste: This waste is generated at Hospitals and Clinics and cannot be processed to anything. This is a very polluting waste because it pollutes when stored or when burned. When burning, hazardous waste has low heat value but very high pollution.
- Burnable waste: Think of remains from Boards or so, which are burnable with high heat value, and have relatively low pollution.
- Other waste: Unspecified waste which cannot be recycled but can be burned with medium heat value.
- Ash: In general, when something is burned (except scrap and construction rubble), ashes are created which cannot be burned anymore.
Waste collection[]
Waste is by default collected in the building in a garbage container stand. When the player opens the properties window of the selected building information is displayed about waste at the item 'Internal garbage container stand'. The internal storage is limited and depends on the functionality of the building. Buildings where workers live have limited storage capacity, while factories producing goods/resources can have a bigger storage capacity.
The player can increase the storage capacity of storing waste near buildings by placing Trash containers/Stand for garbage containers. The player has to take in account that when a trash container/Stand for garbage containers is placed, nearby a building, the default storage for the building will become the Trash container/Stand for garbage containers and the internal garbage container stand in the building is not being used anymore. These Trash containers/Stand for garbage containers collect only waste which is produced by workers living in residential buildings and/or working in factories. Waste produced from processing waste will not be stored in Trash containers//Stand for garbage containers.
Waste is being picked up by Garbage trucks or Big container trucks. The big containers are usually used by factories but can also be provided in residential areas at container stands. The player has to take in account that these container stands in common, should be in close range of the buildings, workers walk only a limited distance (approx. 125m on gravel footpath) with their waste. The advantage of using container stands is that the Garbage trucks don't have to pick up the waste from each individual building.
There are specific trucks for specific containers, meaning that the waste trucks can not pick up every container. The garbage truck can only pick up the small containers while the Big container truck can only pick up the big containers. The home for garbage trucks and/or big container trucks is the Technical services building. When the technical services building is selected by the player, the player can set sources where the garbage trucks and/or big container trucks, belonging to that technical services building, should deliver the waste. The player can assign sources for:
- Metal scrap
- Aluminium scrap
- Biological waste
- Plastic waste
- Hazardous waste
- Mixed waste
When a garbage truck/big container truck is fully loaded with waste, the truck delivers the waste to a source, as assigned in the technical services building. A garbage truck/big container truck can also be scheduled on a direct line.
Waste processing[]
Waste will eventually have to leave the republic. But before this happens, the waste can be processed first. Waste processing takes place in two steps:
- Separation
- Recycling
The waste contains processed raw materials that can be recovered. To do this, the waste must be separated first. The separation of waste takes place in a separation plant. Garbage trucks and big container trucks deliver mixed waste to the the separation plant. The mixed waste is processed and separated after which different types of waste are created. Think of Construction waste, Aluminium scrap, Metal scrap, Plastic waste. In addition to these types of waste, mixed waste is created again, but with a different composition than that what was delivered at the separation plant. It has no use to provide this mixed waste to a separation plant again, because all the processed raw materials are already separated.
With the separated waste, the player now has the option to extract processed raw materials from the waste. These raw materials can be Steel, Aluminium, Plastic and Gravel and can be extracted from the associated waste. The waste must be transported from the separation plant to a Recycling plant. A corresponding recycling plant is available for each of the four processed raw materials just mentioned. The transport of the waste between those plants is handled by big container trucks.
Waste disposal[]
At any time the player can choose to dispose the waste by burning it or by exporting across the border via a customs house. There is a downside about burning waste and that is Pollution. Waste is burned in an Incinerator and if the player chooses to burn the waste he can choose from several incinerators. There are even Incinerators which are generating power or heat from burning waste. In the end, Mixed waste remains, which mainly consists of ash.
Waste Storage[]
Waste can be stored in dumps or in big containers. In big containers the storage is very limited while in dumps there is a lot of storage space. The downside of dumps without claw machines is that loading of waste trucks takes a lot of time, making these dumps more like landfills. Loading from dumps with claw machines is very fast for waste trucks. The Transfer for big containers is actually a parking place for containers. A big container truck is the only waste truck which can use this facility. The loading and unloading for big containers is fast.
Dumps and Transfer for big containers have a Factory connection so that they can be connected to factories. When connecting waste storage to factories the player needs to take in account that these storage are only an extension of the internal storage of the factory. These storages will not be handled from the Technical services building. The behaviour for connecting waste storage via a factory connection to Separation plants differs from other buildings. The factory connection can only work between those two structures if the two-way factory connection is converted into a one-way factory connection.
Notes[]
- Walking distance for workers to container stands is limited to 125m over a gravel footpath.
- A Trash container or Stand near an industrial building only collects the waste which are produced by the workers working at that building, not the processed waste from a separation plant.
- When a container stand is nearby a building, this container stand will be the default place where waste is collected, leaving the internal garbage container stand of the building unused.
- It is useless to provide mixed waste from a separation plant to the same or another separation plant, because all the processed raw materials are already separated.
- One-way factory connections must be used between waste storage and separation plants.
[]
Trash containers[]
Name | Cost | Lifespan | Storage | Structure | Notes |
---|---|---|---|---|---|
Stand for small waste containers (small) |
Workdays, 0.88t Concrete, 0.68t Gravel, 0.54t Asphalt, 0.79t Prefab panels, 0.079t Steel |
17 20 years | Mixed waste | 0.72t1x Road access | |
Stand for small waste containers (small) |
Workdays, 0.88t Concrete, 0.68t Gravel, 0.79t Prefab panels, 0.079t Steel |
17 20 years | Mixed waste | 0.72t1x Footpath access | |
Stand for small waste containers (large) |
Workdays, 3.3t Concrete, 2.6t Gravel, 2.0t Asphalt, 1.6t Prefab panels, 0.16t Steel |
50 20 years | Capacity 2.2t with a mix of: Mixed waste, Metal scrap, Aluminium scrap, Plastic waste, Biological waste, Hazardous waste |
1x Road access | |
Stand for small waste containers (large) |
Workdays, 0.88t Concrete, 0.68t Gravel, 0.79t Prefab panels, 0.079t Steel |
50 20 years | Capacity 2.2t with a mix of: Mixed waste, Metal scrap, Aluminium scrap, Plastic waste, Biological waste, Hazardous waste |
1x Footpath access | |
Stand for big waste containers (small) |
Workdays, 3.2t Concrete, 2.5t Gravel, 2.0t Asphalt, 1.6t Prefab panels, 0.16t Steel |
49 20 years | Capacity 52t with a mix of: Mixed waste, Metal scrap, Aluminium scrap, Plastic waste, Biological waste, Hazardous waste |
1x Road access | |
Stand for big waste containers (large) |
Workdays, 12t Concrete, 9.8t Gravel, 7.8t Asphalt, 3.5t Prefab panels, 0.35t Steel |
171 20 years | Capacity 52t with a mix of: Mixed waste, Metal scrap, Aluminium scrap, Plastic waste, Biological waste, Hazardous waste |
1x Road access |
Separation plants[]
Name | Cost | Workers | Consumption | Pollution | Energy | Wattage | Storage | Structure | Notes | |
---|---|---|---|---|---|---|---|---|---|---|
General separation |
See below | 50 | Mixed waste 1.00m3/day Water 1.8MWh Power |
50t 2.40 tons/year | 3.3 MWh | 55 kW | Dump Mixed waste (import) Big garbage container 50t Mixed waste (export) Aggregate storage 20t Construction waste (export) Aggregate storage 12t Metal scrap (export) Aggregate storage 14t Aluminium scrap (export) Open space storage 16t Plastic waste (export) Big garbage container 6.5t Mixed waste (export) |
80t Access | 1x road access 3x Footpath access 1x Factory connection 1x Conveyor connection |
|
L/U | 2 | |||||||||
Scrap separation |
See below | 15 | Mixed waste 0.30m3/day Water 6.0MWh Power |
320t 2.40 tons/year | 6.5 MWh | 107 kW | Dump Mixed waste (import) Big garbage container 30t Mixed waste (export) Aggregate storage 18t Metal scrap (export) Big garbage container 6.5t Mixed waste (export) |
60t Access | 1x road access 2x Footpath access 1x Factory connection 1x Conveyor connection |
|
L/U | 2 | |||||||||
Aluminium separation |
See below | 20 | Mixed waste 0.40m3/day Water 6.0MWh Power |
20t 2.40 tons/year | 6.6 MWh | 110 kW | Dump Mixed waste (import) Big garbage container 30t Mixed waste (export) Aggregate storage 14t Aluminium scrap (export) Big garbage container 6.5t Mixed waste (export) |
45t Access | 3x footpath access 1x road access 3x factory connection |
|
L/U | 2 |
Recycling plants[]
Name | Cost | Workers | Consumption | Production | Pollution | Energy | Wattage | Storage | Structure | Notes | |
---|---|---|---|---|---|---|---|---|---|---|---|
Gravel recycling plant |
See below | 15 | Construction waste 0.30m3/day Water 18MWh Power |
90t Gravel | 60t4.20 tons/year | 18 MWh | 307 kW | Aggregate storage Construction waste (import) Aggregate storage 270t Gravel (export) Big garbage container 6.5t Mixed waste (export) |
40t Access | 1x road access 2x Footpath access 1x Conveyor connection (import) 2x Conveyor connection (export) |
|
L/U | 2 | ||||||||||
Plastic recycling plant |
See below | 20 | Plastic waste 0.40m3/day Water 4.2MWh Power |
10t Plastic | 2.0t3.30 tons/year | 4.8 MWh | 80 kW | Open space storagePlastic waste (import) Warehouse 7.5t Plastic (export) Big garbage container 6.5t Mixed waste (export) |
24t Access | 1x road access 3x footpath access 3x factory connection |
|
L/U | 2 | ||||||||||
Steel recycling plant |
See below | 30 | Metal scrap 0.60m3/day Water |
36t Steel | 19t9.60 tons/year | 3.0 MWh | 50 kW | Aggregate storage Metal scrap (import) Open space storage 50t Steel (export) Big garbage container 6.5t Mixed waste (export) |
36t Access | 1x road access 2x footpath access 2x factory connection 2x Conveyor connection (import) |
|
L/U | 3 | ||||||||||
Aluminium recycling plant |
See below | 25 | Aluminium scrap 0.50m3/day Water |
25t Aluminium | 12t7.20 tons/year | 3.0 MWh | 50 kW | Aggregate storage Aluminium scrap (import) Open space storage 40t Aluminium (export) Big garbage container 6.5t Mixed waste (export) |
35t Access | 3x footpath access 1x road access 3x factory connection |
|
L/U | 2 | ||||||||||
Waste treatment plant |
See below | 30 | Hazardous waste 3.8t Chemicals 0.60m3/day Water |
7.5t Hazardous waste | 3.0t8.00 tons/year | 3.0 MWh | 50 kW | Dump Hazardous waste (import) Warehouse 6.0t Chemicals (import) Dump 50t Mixed waste (export) Big garbage container 6.5t Mixed waste (export) |
100t Access | 4x footpath access 1x road access 9x factory connection |
|
L/U | 3 |
Incinerators[]
Name | Cost | Workers | Consumption | Pollution | Energy | Wattage | Storage | Structure | Notes | |
---|---|---|---|---|---|---|---|---|---|---|
Incinerator (small) |
See below | 15 | Mixed waste 0.30m3/day Water |
30t 59.40 tons/year | 3.0 MWh | 50 kW | Dump Mixed waste (import) Big garbage container 32t Mixed waste (export) Big garbage container 6.5t Mixed waste (export) |
55t Access | 1x road access 2x Footpath access 2x Factory connection (import) |
|
L/U | 2 | |||||||||
Incinerator (large) |
See below | 25 | Mixed waste 0.50m3/day Water |
58t 71.00 tons/year | 30. MWh | 50 kW | Dump Mixed waste (import) Big garbage container 78t Mixed waste (export) Big garbage container 6.5t Mixed waste (export) |
95t Access | 1x road access 2x Footpath access 2x Factory connection (import) |
|
L/U | 2 | |||||||||
Incinerator - Power plant |
See below | - | - | - | - | - | - | Access | - | See Incinerator - Power plant |
L/U | - | |||||||||
Incinerator - Heating plant |
See below | - | - | - | - | - | - | Access | - | See Incinerator - Heating plant |
L/U | - |
Scrapyards[]
Name | Cost | Workers | Consumption | Production | Lifespan | Energy | Wattage | Storage | Structure | Notes | |
---|---|---|---|---|---|---|---|---|---|---|---|
Scrapping facility (smaller) |
See below | 50 | Water | 1.00m3/hMixed waste | 0.20kg per worker20 years | 3.0 MWh | 50 kW | 40t Steel(export) 40t Aluminium(export) 10t Mechanical components(export) 7.0t Electro components(export) 24t Metal scrap(export) 21t Aluminium scrap(export) 50t Mixed waste(export) |
Access | 1x road access |
|
L/U | 3 | ||||||||||
Scrapping facility (larger) |
See below | 120 | Water | 2.40m3/hMixed waste | 0.20kg per worker20 years | 3.6 MWh | 60 kW | 80t Steel(export) 80t Aluminium(export) 20t Mechanical components(export) 14t Electro components(export) 54t Metal scrap(export) 28t Aluminium scrap(export) 110t Mixed waste(export) |
Access | 1x road access |
|
L/U | 3 | ||||||||||
Ship scrapping facility (smaller) |
See below | 90 | Water | 1.80m3/hMixed waste | 0.20kg per worker20 years | 3.0 MWh | 50 kW | 80t Steel(export) 20t Mechanical components(export) 14.0t Electro components(export) 48t Metal scrap(export) 85t Mixed waste(export) |
Access | 1x road access |
|
L/U | 3 | ||||||||||
Ship scrapping facility (larger) |
See below | 280 | Water | 5.60m3/hMixed waste | 0.20kg per worker20 years | 8.4 MWh | 140 kW | 150t Steel(export) 40t Mechanical components(export) 28t Electro components(export) 150t Metal scrap(export) 190t Mixed waste(export) |
Access | 1x road access |
|
L/U | 3 |
Storages[]
Name | Cost | Lifespan | Energy | Wattage | Storage | Structure | Notes | |
---|---|---|---|---|---|---|---|---|
Dump (small) |
Workdays, 8.7t Concrete, 6.7t Gravel |
101 20 years | None | None | Mixed waste | 80tAccess | 1x Road access 3x Factory connection |
|
L/U | 1 | |||||||
Dump (medium) |
Workdays, 8.7t Concrete, 6.7t Gravel |
101 20 years | None | None | Mixed waste | 270tAccess | 1x Road access 3x Factory connection |
|
L/U | 2 | |||||||
Dump (free) |
None | 20 years | None | None | Mixed waste | 140tAccess | 1x road access |
|
L/U | 1 | |||||||
Dump with claw machine(small) |
See below | 20 years | 11 MWh | 186 kW | Mixed waste | 130tAccess | 1x Road access 2x Factory connection |
|
L/U | 2 | |||||||
Dump claw machine(large) |
See below | 20 years | 11 MWh | 186 kW | Mixed waste | 350tAccess | 1x Road access 3x Factory connection |
|
L/U | 2 | |||||||
Transfer for big waste containers (small) |
See below | 20 years | 3.0 MWh | 50 kW | 15 Waste containers | Access | 1x Road access 3x Factory connection |
|
L/U | 1 | |||||||
Transfer for big waste containers (large) |
See below | 20 years | 3.0 MWh | 50 kW | 30 Waste containers | Access | 1x Road access 3x Factory connection |
|
L/U | 2 |
Construction[]
- General separation
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 1185 23t 37t 28t 1.1t 58t | Workdays 434 23t 37t 28t Mechanisms: Excavators (max. 5) Needs workers (max. 118) |
- Scrap separation
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 521 9.2t 14t 11t 0.80t 24t | Workdays 173 9.2t 14t 11t Mechanisms: Excavators (max. 3) Needs workers (max. 51) |
- Aluminium separation
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 550 10t 16t 12t 0.88t 25t | Workdays 193 10t 16t 12t Mechanisms: Excavators (max. 5) Needs workers (max. 54) |
- Gravel recycling plant
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 810 20t 33t 25t 1.8t 24t | Workdays 384 20t 33t 25t Mechanisms: Excavators (max. 5) Needs workers (max. 80) |
- Plastic recycling plant
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 576 8.5t 13t 10t 1.8t 22t | Workdays 160 8.5t 13t 10t Mechanisms: Excavators (max. 3) Needs workers (max. 57) |
- Steel recycling plant
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 1122 18t 29t 22t 2.6t 50t | Workdays 343 18t 29t 22t Mechanisms: Excavators (max. 4) Needs workers (max. 111) |
- Aluminium recycling plant
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 667 11t 19t 14t 1.8t 26t | Workdays 221 11t 19t 14t Mechanisms: Excavators (max. 4) Needs workers (max. 66) |
- Waste treatment plant
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 2271 58t 165t 73t 2.3t 32t 45t 15t | Workdays 1106 58t 95t 73t Mechanisms: Excavators (max. 7) Needs workers (max. 226) |
- Incinerator (small)
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 2235 19t 31t 24t 4.2t 34t 110t 36t | Workdays 369 19t 31t 24t Mechanisms: Excavators (max. 3) Needs workers (max. 223) |
- Incinerator (large)
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 4992 60t 97t 75t 3.9t 54t 284t 94t | Workdays 1129 60t 97t 75t Mechanisms: Excavators (max. 6) Needs workers (max. 498) |
- Scrapping facility (smaller)
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 933 20t 54t 25t 2.3t 17t 11t 3.8t | Workdays 390 20t 33t 25t Mechanisms: Excavators (max. 5) Needs workers (max. 92) |
- Scrapping facility (Larger)
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 1620 34t 104t 43t 3.3t 29t 26t 8.8t | Workdays 648 34t 58t 43t Mechanisms: Excavators (max. 5) Needs workers (max. 161) |
- Ship scrapping facility (smaller)
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 3672 87t 272t 109t 9.0 74t 17t 5.9t | Workdays 1649 87t 142t 109t Mechanisms: Excavators (max. 2) Needs workers (max. 366) |
- Ship scrapping facility (Larger)
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 5138 122t 403t 152t 11t 106t 27t 9.3t | Workdays 2292 122t 198t 152t Mechanisms: Excavators (max. 2) Needs workers (max. 513) |
- Dump (small)
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 101 8.1t 8.1t 6.7t | Workdays 1 Mechanisms: Excavators (max. 1) Needs workers (max. 50) |
- Dump (medium)
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 346 16t 26t 20t 5.8t 0.58t | Workdays 307 16t 26t 20t Mechanisms: Excavators (max. 1) Needs workers (max. 50) |
- Dump with claw machine (small)
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 1798 13t 22t 17t 11t 54t | Workdays 260 13t 22t 17t Mechanisms: Excavators (max. 1) Needs workers (max. 179) |
- Dump with claw machine (large)
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 3287 27t 45t 34t 20t 97t | Workdays 521 27t 45t 34t Mechanisms: Excavators (max. 1) Needs workers (max. 328) |
- Transfer for big waste containers (small)
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 113 5.0t 8.2t 6.3t 2.7t 0.27t | Workdays 95 5.0t 8.2t 6.3t Mechanisms: Excavators (max. 1) Needs workers (max. 50) |
- Transfer for big waste containers (large)
Requirements | Groundworks | |||
---|---|---|---|---|
Workdays 266 12t 20t 15t 4.5t 0.45t | Workdays 235 12t 20t 15t Mechanisms: Excavators (max. 1) Needs workers (max. 50) |
Gallery[]